Friday, June 26, 2009

Downtown Reconstruction Moving toward Completion

The Downtown Brainerd Reconstruction project is on schedule according to contractor, Tom's Backhoe.

The alley between 7th and 8th street will be paved Monday, weather permitting.

Paver installation is expected to be done by the end of next week.

Sprinkler systems in the planting bed areas will be installed beginning today with installation of planting beds, pre-cast pillars, and railings to begin next week.

All roads are expected to be open for the July 4th weekend. Closure of roads after that will be on an as needed basis.

AddThis Social Bookmark Button

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home

Subscribe to
Posts [Atom]

Powered by Blogger

 

Home | Schedule | News | Weather | Streaming | Contests | Home Shopping | Obits | Trips | Events | Service

Advertise with Us | About | Contact | Directions | FAQ | Site Map | Links | EEO

Copyright 2007 KLKS. All rights reserved.

Explore Brainerd Lakes

Site Meter